The capacity of 3 kilowatts to 10 kilowatts as per MNRE and Electricity Department for Subsidy:
Capacity in kW |
Production Per Day Unit |
Production Per Month |
Production Per Year |
Electricity Average Savings Per Year (Unit) |
Savings from Production |
Cost | Subsidy |
03 kW | 13 Unit | 390 | 4,680 | 8 | 37,440 | 1,95,000 | 78,000 |
04 kW | 16 Unit | 480 | 5,760 | 8 | 46,080 | 2,40,000 | 78,000 |
05 kW | 20 Unit | 600 | 7,200 | 8 | 57,600 | 2,95,000 | 78,000 |
06 kW | 24 Unit | 720 | 8,640 | 8 | 69,120 | 3,40,000 | 78,000 |
07 kW | 28 Unit | 840 | 10,080 | 8 | 80,640 | 4,02,000 | 78,000 |
08 kW | 32 Unit | 960 | 11,520 | 8 | 92,160 | 4,45,000 | 78,000 |
10 kW | 13 Unit | 1,200 | 14,400 | 8 | 1,15,200 | 5,10,000 | 78,000 |
For your reference ROI (Return of Investment) of 3 kW system:
Daily | Monthly | Annual | Average | Saving from production |
12 to 14 Units | 390 Units | 4680 Units | 4680 per year | 4680X8 per unit 37,440 |
Particulars | (Amount in Rupees) |
Savings from production in 3 years (37,440×3 years) | ₹ 1,12,330 |
Total Product Cost inclusive of all taxes | ₹ 1,95,000 |
Less: Government Subsidy | ₹ 78,000 |
Final Product Cost | ₹ 1,17,000 |
|
|
ROI (Return of investment) in the37 months will be | ₹ 1,17,700 |
As per the above calculation, your solar system’s cost recovers in 3 years and 1 month. |
Solar System Make and Certification:
Product Description | Make | Certification |
PV Module | Luminous, waaree, TATA, adani. | BIS CRS Certificate as per as per IS:14286 |
Inverter | Luminous, waaree, Havells, Sungrow, Growwatt UTL, etc., | BIS approved Lab |
Cable and Accessories | Havells, Polycab, Anchor | BIS approved Lab |
Solar Structure | Hot dip galvanized MS mounting structures as per Grade: E300 (as per IS:2062:2011 latest) |
Warranty & Guarantee by Manufacture |
|
PV Module | >/=25 Years |
Inverter | >/= 5 Years |
Solar Battery | >/= 3 Years |
Cable and Accessories | 6 months |
Note:
Installing this system does not affect the load of any appliances installed in the house, such as TVs, ACs, motors, geysers, etc. The SIM card that is already running will run as before. No change of any kind is necessary.
You can easily decide which type of solar system to install from the readings coming on your electricity bill.
Require documents for applying to this scheme:
1) Adhaar Card (Both Sides)
2) Last Paid Electricity Bill
3) Property Tax Receipt
4) Cancelled Cheque and Bank account passbook for direct transfer of subsidy amount.
Note: Net-Metering work will be completed within 30 days, The Above prices are for normal roof front 3 feet and back 5 feet specifications, for super elevated structure charges will be extra at actuals, AC/DC cable upto 50 meters is in our scope of installation. If extra cable is required it will be charged at actuals.